Electricity
Supply |
Water Supply |
Heat Supply |
Gas |
Communication |
Environmental Protection |
 |
|
Present
Total Electricity Supply
Capacity of Lianyungang
Liangyungang
owns a domestic first class
thermal power plant--Jiangsu
Xinhai Electric Power Co.,
Ltd with the total installed
capacity of 522.5 MW. It
owns two thermal generating
sets with single-machine
capacity of 220 MW. |
|
|
|
Middle and
Long Term Electricity Supply
Capacity of Lianyungang
Tianwan
Nuclear Power Plant: two sets
with the single-machine capacity
of 1,060MW respectively at the
first phase: the first set has
generated electricity, the
second set will generate
electricity in 2006; Another two
sets with the single-machine
capacity of 1,060MW respectively
at the second phase: the first
set will generate electricity in
2007; the second set will
generate electricity in 2008.
|
|
|
|
Present Total
Electricity Supply Capacity of the
Development Zone
The development
zone can supply ample electricity. Many
types of output voltage are available
such as 110KV, 35KV, 10KV. Etc. |
 |
|
Profile
Over 40
main streams and branches pass
through the city, including
Xinyi River, Xinshu River,
Rosebush River and Yan River,
among which there are 17 rivers
going directly to the sea. Yan
River connects with Jinghang
Grand Canal and Yangtze River.
There are 168 reservoirs in the
city, among which water demand
of Shilianghe, Xiaotashan,
Anfengshan reservoirs have large
water-stored capacity.
Shilianghe Reservoir ranks the
first in water-stored capacity
in Jiangsu Province, which can
store water of 0.4 billion cubic
meters. The total amount of
water resources is 5.6 billion
cubic meters and the utilization
ratio reaches 40%. Every citizen
can occupy water of 1,600 cubic
meters. |

กก
|
|
|
Lianyungang No. Three Water
Plant with daily water supply of
200,000 tons has two DN600mm
pipes to provide water for
production & civil use to all
the enterprises in the
development zone; one DN500mm
pipe to provide water for
industry & civil use to all the
enterprises in the high and new
technological development zone.
Water Supply
Parameter
1.
Temperature of water:
1.0-31.3degree;
2. PH
value: 7.31-8.12;
3 Total
hardness: 120-216mg/l;
4
Pressure: 0.3MPa |
|
|
|
 |
|
Central Part, Export
Processing Zone & Near-Port Industry
Zone
1. Heat supply is
centralized in the zone. At present,
Haixing Thermoelectric Plant has two
boilers with the installed capacity of
35 tons/hour;
2. It can provide saturated vapor with
pressure under 35 bars; and provide 12.7
bar vapor and the temperature is usually
controlled below 265degree |
|
High and New
Technological Industry Zone & Dapu
Industry Zone
1. The installed
capacity of No. 2 Thermoelectric Plant
will be enlarged from the present 40
tons/hour to 110 tons/hour;
2. It is able to supply saturated vapor
with pressure under 6 bars and vapor
temperature is usually controlled below
170degree.
3. Another thermoelectric plant is under
construction and will be built up in
2006. The total amount of investment is
RMB 250 million. It can generate
electricity of 170 million kw*h annually
and provide 200,000 tons of heat. |
 |
|
1. Liquid
natural gas: gas supply capacity
is 240,000 m3 /day; heat value
is 9000kcal/m3;
2. Supply of pipe natural gas at
the end of 2005: DN300mm pipe
will be mostly used. |
|
|
 |
|
The total number of
program-controlled telephones in
Lianyungang has reached 1,400,000. Many
services are easily provided, such as
Domestic Direct Dial (DDD) telephone and
International Direct Dial telephone (IDD),
cable, fax, wireless communication and
vision TV data transmission. |
 |
|
Sewage
Treatment
Drainage
system of the development zone
consists of rain system and
polluted water system. The
sewage from High and New
Technological Industry Zone and
Dapu Industry Zone is treated
collectively in Dapu Sewage
Treatment Plant whose treatment
facility of 100,000t/d in the
first stage has been put into
use and the treatment facility
of the second class was built up
at the end of 2004. The sewage
from the central zone and the
export processing zone is
treated collectively in Xugou
Sewage Treatment Plant which has
the first stage treatment
capacity of 50,000t/d, the plan
of the second stage facility has
been initially completed, the
project has been under
construction and will be built
up by 2006. |
|
|
|
Execution Standard
In 2003, the
administrative committee of the
development zone established ISO14001
environmental management system and
obtained identification certificate,
which meets international standard.
Effluent Standard of Pollutant of the
development zone in Lianyungang |
|
|