Electricity |
Water supply |
Heating |
Gas |
Fuel |
Sewage treatment |
 |
|
Price of electricity
for industry
|
User type
|
Voltage Type
|
Price RMB/(Kw*h)
|
|
Valley time
|
Usual time
|
Peak time
|
|
Big industry enjoying no
preferential prices
|
1-10KV
|
0.241
|
0.544
|
0.907
|
|
35-110KV
|
0.236
|
0.529
|
0.882
|
|
110KV
|
0.231
|
0.514
|
0.857
|
|
>220 KV
|
0.226
|
0.499
|
0.832
|
|
Big industry enjoying
preferential prices
|
1-10KV
|
0.238
|
0.534
|
0.890
|
|
35-110KV
|
0.233
|
0.519
|
0.865
|
|
110KV
|
0.228
|
0.504
|
0.840
|
|
>220 KV
|
0.223
|
0.489
|
0.815
|
|
Common industry enjoying no
preferential prices(power
consumption >100KVA)
|
<1KV
|
0.305
|
0.735
|
1.225
|
|
1-10KV
|
0.300
|
0.720
|
1.200
|
|
35-110KV
|
0.295
|
0.705
|
1.175
|
Notes:1.For the electricity user
using electric current above 200KVA,
different price is adopted in different
time:
Peak time 8:00-12:00
17:00-21:00
Usual time 12:00-17:00
21:00-24:00
Valley time 24:00-tomorrow
8:00
The price ratio in peak
time and valley time is 5 to 1 .
2.The big industry enjoying
preferential prices includes calcium
carbide, electrolytic caustic soda,
synthetic ammonia, yellow phosphorus by
the method of electric furnace
processing. |
Price of
electricity for lighting
Unit :RMB/(Kw*h)
|
User type
|
<1KV
|
1-10KV
|
35-110KV
|
|
Resident
|
0.520
|
0.510
|
/
|
|
Commerce
|
0.899
|
0.884
|
0.869
|
|
Others
|
0.862
|
0.847
|
0.832
|
|
 |
|
Tap water
price of tap water in
Lianyungang(Unit:RMB /T)
|
Type
|
Basic price
|
Urban surcharge
|
Sewage
treatmentcharge
|
Special Charge for
provincial departments
|
Water charge
|
Final price
|
|
Civil use
|
1.135
|
0.085
|
0.88
|
0.02
|
0.13
|
2.25
|
|
Industry use
|
1.54
|
0.108
|
0.83
|
0.02
|
0.13
|
2.628
|
|
Commercial Service
|
1.788
|
0.13
|
0.93
|
0.02
|
0.13
|
2.998
|
|
Noncommercial service
|
1.107
|
|
|
0.02
|
0.13
|
1.257
|
|
Special use
|
3.383
|
0.12
|
0.93
|
0.02
|
0.13
|
4.583
|
Preferential
industry use:
If the consumption is
20,000-50,000t/day£¬basic price will be
reduced by RMB0.4 /t
If the consumption exceeds
50,000t/day, the special pipe can be
paved, the water price can be
negotiated. |
|
Establishing a
self-possessed water plant
1. Water rate and
water resources charge: 0.22/cubic meter
2. If the water is taken through
using agricultural irrigation water
resources and facilities, a compensation
fee not lower than the standard of
RMB35/(T*day) will be collected once and
for all.
3. Compensation for using riverway
and dike is RMB0.1426/cubic meter, If
the water is in-taken through using
agricultural irrigation water resource
and facilities , a compensation fee not
lower than 35 Yuan/t will be collected
once and for all. |
 |
|
The continuous supply of vapor is
RMB 150/T, the discontinuous supply is
RMB 159/T (eg. winter heating).
|
 |
1. Liquid petroleum mixed gas is RMB
2.5 /M3
2. Liquid natural gas is RMB 2.5/ M3
for civil use, the price for industrial
and commercial use can be raised by 10%
and lowered by any percent, the price is
finally settled down by the buyer and
the seller through negotiation. |
 |
1. The diesel oil of 0# is RMB 3.74/
liter in May 2005. They can be
sufficiently supplied
2. 5200 kcal soft coal is RMB450/T
in May 2005; The soft coal was
transported from Gansu Shanxi and can be
purchased in Xuzhou and Lianyungang.
They can be sufficiently supplied. |
 |
|
The sewage treatment charge will be
calculated according to the consumption
of running water at the price of RMB
0.88/T for civil and RMB 0.83/T for
industry use. Fee has been collected
from the running water fee and will not
be collected separately any more. For
those who own a water plant, the sewage
treatment charge will be collected
according to regulations if they
discharge the urban sewage into the
sewage treatment facilities. |