Logistics & Communications Infrastructure Land
Human Resources Cost Construction Cost  
Investment Cost>> Construction Cost

 
Building Materials Stipulated Charge
Referential sales price for building materials in Lianyungang
 
 
No.
Specifications
Unit
Price (RMB)
1
Lumber
M3
1500.00
2
Template
M3
1250.00
3
Hardwood
M3
2100.00
4
Reinforcing steel bar (all types)
T
3580.00
5
Reinforcing steel bar with rib
T
4050.00
6
Cement (32.5 class)
T
250.00
7
Cement (42.5 class)
T
285.00
8
Cement (rotary kiln 32.5)
T
260.00
9
Cement (rotary kiln 42.5)
T
290.00
10
Carpolite
T
35.00
11
Sand
T
31.00
12
Rubble
T
32.00

      Notes: Actual price is calculated at the market price.

Referential sales price for concrete

Categories
High and New Technological Industry Zone,Dapu Industry Zone
Central Area of the Development Zone, Export Processing Zone, Near-port Industry Zone
Not transferred by pump (RMB)
Transferred by pump (RMB)
Not transferred by pump (RMB)
Transferred by pump (RMB)
C20
250
270
260
280
C25
270
285
280
295
C30
295
305
305
325
C35
305
325
315
335
C40
325
345
345
365
C45
350
370
370
390

      Remarks: 1. The above-mentioned price does not include the price of special additive;
            2. The transferring distance is limited within 10KM, RMB2.5/(KM*M3)is collected for transferring every additional 10KM;
            3. The above-mentioned price refers to the price at which every cubic meter of concrete is transferred into the molding board.

    Charge collected in the zone is a little and the standard is low. Every stipulated charge for construction is only 30% of the charge collected from enterprises outside the zone.

Main administration charge in construction stage

No.
Items
Charge standard
Collecting institution
Charge principles
Notes
1
Integrated service charge for construction project dealing
1. RMB4,500 to be collected for each construction project not more than RMB2,000,000(RMB2,000,000 included)
Tendering
Center
SU JIA FU [2003]171
70% paid by bid winner,
30% paid by tenderee
2. RMB6,500 to be collected for each construction project between RMB2,000,000 and RMB5,000,000(RMB5,000,000 included)
3. RMB9,500 to be collected for each construction project between RMB5,000,000 and RMB10,000,000(RMB10,000,000 included)
4. RMB13,000 to be collected for each construction project between RMB10,000,000 and RMB15,000,000(RMB15,000,000 included)
5. RMB16,000 to be collected for each construction project between RMB15,000,000 and RMB30,000,000(RMB30,000,000 included)
6. RMB20,000 to be collected for each construction project between RMB30,000,000 and RMB50,000,000(RMB50,000,000 included)
7. RMB35,000 to be collected for each construction project between RMB50,000,000 and RMB100,000,000(RMB100,000,000 included)
8. RMB45,000 to be collected for each construction project between RMB100,000,000 and RMB500,000,000(RMB500,000,000 included)
9. RMB50,000 to be collected for each construction project above
RMB500, 000,000
2
People's air defence, site-altering and construction
RMB 48 /m2
Collected by people's
air defence department
SU CAI ZONG [2002]107
SU JIA FU [2002]294
No charges to be collected for industrial building, charges to be collected for non-industrial building
3
City infrastructure
Common construction projects: RMB 90/m2
Social welfare like education and health care: RMB45/ m2
Construction department
LIAN ZHENG FA [2004]35
Free of charge for industrial building
4
Construction project quality supervision charge
3 per mille of the price of the construction and installation (the real estate collects the charge at 2.3 per mille of the price of the construction and installation)
 
Collected by quality supervision institution
SU ZHEN FA [2002]105
 
5

House property registration charge
Below 500m2 RMB400
500-1000m2 RMB600
1000-2000m2 RMB1000
2000-5000m2 RMB1500
5000-10000m2 RMB2000
10000-20000m2 RMB4000
Above 20000m2 RMB10000
 
Collected by house management institution
SU JIA FU [2002]221
SU CAI ZONG [2002]89
House property registration for enterprise's self-building house.
6
Commission charge in house dealing
Commission charge RMB10/ m2 to be collected for selling a house (paid by seller and buyer in equal)
Collected by house management institution
SU JIA FU [2002]221
SU CAI ZONG [2002]89
Collected when the enterprise is
purchasing the house for working, business operation and manufacture
Commission charge for renting a house which is not for living. Below 1000 m2, RMB200/piece is collected, above 1000 m2, RMB300/piece is collected.
 
Collected when the enterprise is renting a house for working, business operation and manufacture.

Tel: 0518-85825182 Fax: 0518-5825181 Email: master@lyg.gov.cn
  Copyright@Lianyungang